Grants per year
- 500 - 550 out of 729 results
Search results
-
Finished
Unified description of the three-dimensional structure of wall-turbulence with large-scales and very large-scales
Adrian, R. (PI)
National Science Foundation (NSF)
8/1/09 → 4/30/13
Project: Research project
-
II-EN: BlueTool: Infrastructure for Innovative Cyberphysical Data Center Management Research
Gupta, S. (PI) & Phelan, P. (CoI)
National Science Foundation (NSF)
8/1/09 → 7/31/13
Project: Research project
-
Plant Fund: SCREMS: Visualization of Complex Spatio-Temporal Multiscale Fluid Dynamic Phenomena
Mahalov, A. (CoI), Lopez, J. (CoI), Herrmann, M. (CoI), Tang, W. (CoI) & Huang, H.-P. (CoI)
National Science Foundation (NSF)
8/1/09 → 7/31/10
Project: Research project
-
Electron Microscopy & Material Handling Equipment Upgrades for 3D Characterization of Microstructure in Surrogate Fuel Materials with Depleted Uranium
Peralta, P. (PI)
7/15/09 → 7/14/10
Project: Research project
-
Improving Condenser Performance in Vapor Compression Microclimate
Phelan, P. (PI)
US Department of Defense (DOD)
4/20/09 → 9/19/09
Project: Research project
-
On-Orbit Assessment of Satellite Structural Properties via Robust Structural Health Monitoring
Chattopadhyay, A. (PI)
DOD-USAF: Air Force Research Labs (AFRL)
2/25/09 → 2/11/12
Project: Research project
-
Comprehensive transformation of junior-year aeronautics instruction based on active/strategic learning and via innovative utilization of modern comput
Wells, V. (PI) & Squires, K. (CoI)
NASA: Goddard Space Flight Center
2/24/09 → 12/31/12
Project: Research project
-
Testing of Modified Engine Cycles for Improved Fuel Efficiency and Emissions
Lee, T.-W. (PI)
2/23/09 → 12/31/09
Project: Research project
-
Investigation of Desiccant-Based Cooling for Greenhouses - Collaboration with TU Delft
Phelan, P. (PI)
1/20/09 → 10/1/09
Project: Research project
-
Active Stuctural Fibers of Multifuncitonal Composite Materials
Herrmann, M. (PI)
DOD-USAF-AFRL: Air Force Office of Scientific Research (AFOSR)
12/1/08 → 7/31/11
Project: Research project
-
CKEM Model Validation - Stage II
Mignolet, M. (PI)
DOD-ARMY-ARL: Army Research Office (ARO)
10/1/08 → 1/30/09
Project: Research project
-
A Collective-Computation Approach to Prognostics Health Management
Liu, H. (PI), Chattopadhyay, A. (CoI) & Papandreou-Suppappola, A. (CoI)
9/1/08 → 8/31/09
Project: Research project
-
Investigation of ZnO Nanowire Interfaces for Multi-Scale Fiber Reinforced Composites
Herrmann, M. (PI)
DOD-ARMY-ARL: Army Research Office (ARO)
8/18/08 → 1/31/12
Project: Research project
-
Numerical Simulation of a Pulverized Coal Burner Model
Herrmann, M. (PI)
8/11/08 → 5/31/09
Project: Research project
-
Failure and Damage Modeling of Woven Fiber Composites Including Aging Effects (Kuang Liu)
Chattopadhyay, A. (PI)
8/7/08 → 8/6/11
Project: Research project
-
Rotocraft Brownout: Revolutionary Concepts in Understanding Control and Mitigation
Squires, K. (PI)
DOD-USAF-AFRL: Air Force Office of Scientific Research (AFOSR)
8/1/08 → 7/31/13
Project: Research project
-
SCISM-Summer Certification Institute in Secondary Mathematics
Krause, S. (CoI), Carlson, M. (CoI) & Middleton, J. (CoI)
National Science Foundation (NSF)
7/1/08 → 9/30/12
Project: Research project
-
The mechanisms and predictability of multi-basin influences on North American droughts
Huang, H.-P. (PI)
US Department of Commerce (DOC)
7/1/08 → 6/30/13
Project: Research project
-
Atomization of Liquids in Non-isothermal environments: Multi-scale Modeling and Simulations
Lopez, J. (PI) & Herrmann, M. (CoI)
National Science Foundation (NSF)
7/1/08 → 6/30/12
Project: Research project
-
Solar-Powered Absorption Cooling System
Phelan, P. (PI) & Wiezel, A. (CoI)
5/10/08 → 12/31/10
Project: Research project
-
Nonlinear Aerodynamic ROM - Structural ROM Methodology for Inflatable Aeroelasticity in Hypersonic Atmospheric Entry
Mignolet, M. (PI)
National Aeronautics Space Administration (NASA)
1/25/08 → 7/24/08
Project: Research project
-
GVT-Based Ground Flutter Test Wind Tunnel
Mignolet, M. (PI)
National Aeronautics Space Administration (NASA)
1/18/08 → 9/30/11
Project: Research project
-
Innovative Research in MHD-Enhanced Aerodynamics
Mikellides, P. (PI)
11/14/07 → 5/31/09
Project: Research project
-
Continuous Dynamic Simulation of Nonlinear Aerodynamics/Nonlinear Structure Interaction (NANSI) for Morphing Vehicles
Mignolet, M. (PI)
DOD-USAF: Air Force Research Labs (AFRL)
10/1/07 → 3/31/10
Project: Research project
-
Learning through Engineering Design and Practice: Using our Human Captial for an Equitable Future
Ganesh, T. (PI), Krause, S. (CoI), Middleton, J. (CoI) & Klug Boonstra, S. (CoI)
National Science Foundation (NSF)
9/1/07 → 8/31/12
Project: Research project
-
A Surface Stress Paradigm for Studying and Developing Catalysts and Storage Materials Relevant to the Hydogen Economy
Friesen, C. (PI)
9/1/07 → 11/30/11
Project: Research project
-
Combined Energy Savings & Greenhouse Gas Emissions Analysis
Phelan, P. (PI)
8/17/07 → 5/18/08
Project: Research project
-
-
Developing a Modular Web-based Preparedness Modeling Tool for Heat Waves Master Agreement
Phelan, P. (CoI)
HHS: Centers for Disease Control and Prevention (CDC)
7/1/07 → 12/31/08
Project: Research project
-
DURIP: Tracking Damage Nucleation and Propagation in Metallic Materials Using Planar Biaxial Test System
Chattopadhyay, A. (PI) & Peralta, P. (CoI)
DOD-USAF-AFRL: Air Force Office of Scientific Research (AFOSR)
6/15/07 → 12/14/08
Project: Research project
-
Mechanics of Stretchable Electronics
Jiang, H. (PI)
National Science Foundation (NSF)
6/1/07 → 5/31/11
Project: Research project
-
Damage Characterization, Structural Health Monitoring and Residual Life Prediction of Advancd Composites
Chattopadhyay, A. (PI)
DOD-ARMY-ARL: Army Research Office (ARO)
4/10/07 → 4/9/11
Project: Research project
-
Coherent Doppler Lidar Deployment in the Canopy Horizontal Array Turbulence Study
Calhoun, R. (PI)
DOD-ARMY-ARL: Army Research Office (ARO)
3/29/07 → 12/28/07
Project: Research project
-
System-Level Approach for Multi-Phase, Nanotechnology-Enhanced Cooling of High-Power Microelectronic Systems
Phelan, P. (PI)
3/8/07 → 9/30/12
Project: Research project
-
Machine Learning Methods with Applications to Composites and Other Mechanical Systems
Chattopadhyay, A. (PI)
2/1/07 → 9/30/08
Project: Research project
-
An Integrated Vehicle Health Management Approach to Heterogeneous Structural Systems
Chattopadhyay, A. (PI), Rajadas, J. (CoI) & Papandreou-Suppappola, A. (CoI)
1/24/07 → 7/23/11
Project: Research project
-
Nonlinear Transient Thermoelastodynamics of Functionally Graded Panels Subjected to Strong Acoustic Excitations
Mignolet, M. (PI)
DOD-USAF-AFRL: Air Force Office of Scientific Research (AFOSR)
12/15/06 → 12/14/09
Project: Research project
-
The Sedona Workshop on the Atmospheric Stable Boundary Layer
Calhoun, R. (CoI)
DOD-ARMY-ARL: Army Research Office (ARO)
9/21/06 → 9/20/07
Project: Research project
-
IPA-Patrick Phelan to the National Science Foundation
Phelan, P. (PI)
National Science Foundation (NSF)
9/5/06 → 9/4/08
Project: Research project
-
NER: Nanoparticle-Filled Liquid Fuels for Efficient Energy Conservation
Lee, T.-W. (PI)
National Science Foundation (NSF)
8/1/06 → 8/31/08
Project: Research project
-
METEOROLOGICAL MECHANISMS AND PATHWAYS OF POLLUTION EXPOSURE: Coherent Doppler Lidar Deployment in Wagerup
Calhoun, R. (PI)
6/1/06 → 8/15/07
Project: Research project
-
MURI: A Multidisciplinary Approach to Health Monitoring and Materials Damage Prognosis for Metallic Aerospace Systems
Chattopadhyay, A. (PI), Peralta, P. (CoI), Papandreou-Suppappola, A. (CoI) & Cochran, D. (CoI)
DOD-USAF-AFRL: Air Force Office of Scientific Research (AFOSR)
5/1/06 → 9/30/12
Project: Research project
-
Pulsed Plasma Accelerators
Mikellides, P. (PI)
National Aeronautics Space Administration (NASA)
5/1/06 → 8/31/07
Project: Research project
-
DURIP: 200,000,000 Frames per Second Camera for Microdetonics Research
Adrian, R. (PI)
DOD-ARMY-ARL: Army Research Office (ARO)
4/1/06 → 9/30/07
Project: Research project
-
Polymer Drag Reduction - A Unified Mechanistic View
Adrian, R. (PI)
DOD-NAVY: Office of Naval Research (ONR)
3/16/06 → 12/31/07
Project: Research project
-
A Proposal to Conduct Save Energy Now Assessments by an ASU-PHAST Qualified Specialist
Phelan, P. (CoI)
3/3/06 → 2/28/07
Project: Research project
-
-
CAREER: Stress and Structure Evolution in Ultra-Thin Heteroepitaxial Metallic Films
Friesen, C. (PI)
National Science Foundation (NSF)
3/1/06 → 2/29/12
Project: Research project
-
Two-dimensional Characterization of Shock Fields from Detonations
Adrian, R. (PI)
2/1/06 → 9/30/09
Project: Research project