Fingerprint
- 1 Similar Profiles
Collaborations and top research areas from the last five years
Grants
- 19 Finished
-
Global Futures Laboratory Projects For Embassy 2050 Innovation for Security, Resilience, and Sustainable Operations
Neveu, M. (CoI), Gerber, B. (CoI), Sailor, D. (CoI), El Asmar, M. (CoI), White, D. (PI) & Gall, M. (CoI)
10/1/21 → 6/10/22
Project: Research project
-
EVMS METR Facilitation: System Maturity and Environment
El Asmar, M. (PI)
National Science Foundation (NSF)
4/13/21 → 12/31/23
Project: Research project
-
Human-Augmented Technology Interaction (HATI) for Improving Construction Quality Control and Task Monitoring An Applicationof Augmented Reality (AR) for Visualization and Remote Project Management Support
El Asmar, M. (CoI)
DOT: Federal Highway Administration (FHWA)
1/31/20 → 12/31/22
Project: Research project
-
Improving the Reliability of Earned Value Management System (EVMS) Compliance Rev
Gibson, G. (PI), El Asmar, M. (CoI), El Asmar, M. (CoI) & Grau, D. (PI)
2/14/19 → 9/12/24
Project: Research project
-
Institutional failures and missed opportunities: insights from engineering administrators on Native faculty hiring
Cruz Rios, F., El Asmar, M., Grau, D. & Parrish, K., 2026, In: Frontiers in Education. 11, 1677398.Research output: Contribution to journal › Article › peer-review
Open Access -
Developing long-term risk & resilience management strategies for physical asset and critical infrastructure projects
Helmrich, A., Gerber, B., Gall, M., Horton, P., El Asmar, M., Sailor, D., Neveu, M., El Kassis, R., Sanboskani, H., Vogel, A., Yu, Y. & White, D., 2025, In: Frontiers in Built Environment. 11, 1530343.Research output: Contribution to journal › Article › peer-review
Open Access -
Qualifications-Driven Procurement Selection Criteria for Design-Build and Construction Manager at Risk Firms
Sanboskani, H. & El Asmar, M., May 1 2025, In: Journal of Structural Design and Construction Practice. 30, 2, 04025010.Research output: Contribution to journal › Article › peer-review
Open Access1 Link opens in a new tab Scopus citations -
A critical review and analysis of decision-support processes and tools for project delivery method selection
Demetracopoulou, V., O'Brien, W. J., Khwaja, N., Feghaly, J. & El Asmar, M., Jan 2 2024, In: Engineering, Construction and Architectural Management. 31, 1, p. 487-505 19 p.Research output: Contribution to journal › Review article › peer-review
14 Link opens in a new tab Scopus citations -
An Effective Earned Value Management System (EVMS) is a Team Sport
Aramali, V., Gibson, G. E., Asmar, M. E. & Sanboskani, H., Aug 2024, In: Project Management Journal. 55, 4, p. 389-405 17 p.Research output: Contribution to journal › Article › peer-review
Open Access2 Link opens in a new tab Scopus citations
Press/Media
-
Renewable Properties Secures 118 MW of Domestically Manufactured First Solar Modules for Executing on Its Solar Pipeline
4/30/26
1 item of Media coverage
Press/Media: Press / Media
-
Geronimo Power announces start of operations at Dodson Creek Solar Project
4/11/26
1 item of Media coverage
Press/Media: Press / Media
-
Geronimo Power Announces Start of Operations in Ohio at Dodson Creek Solar Project
4/3/26 → 4/6/26
34 items of Media coverage
Press/Media: Press / Media
-
Geronimo Power Announces Start of Operations in Ohio at Dodson Creek Solar Project | FSLR Stock News
4/3/26
1 item of Media coverage
Press/Media: Press / Media
-
Verogy Begins Construction on Sixth SCEF Solar Project of the Year, Bringing Clean Energy and Economic Benefits to Connecticut’s Communities
9/23/25
1 item of Media coverage
Press/Media: Press / Media