TY - JOUR
T1 - Erratum to
T2 - Planning Production and Equipment Qualification under High Process Flexibility (Production and Operations Management, (2021), 30, 10, (3369-3390), 10.1111/poms.13439)
AU - Feng, Jianguang
AU - Li, Hongmin
AU - Huh, Woonghee T.
AU - Sampaio, Matheus C.
AU - Keng, Naiping
N1 - Publisher Copyright: © 2022 Production and Operations Management Society.
PY - 2022/4
Y1 - 2022/4
N2 - Correspondence Hongmin Li, W.P. Carey School of Business, Arizona State University, Tempe, Arizona, 85287, USA We correct errors in Li et al. (2021) in this note. capacity planning; erratum; flexible capacity; qualification; sequence-dependent setup Correspondence Hongmin Li, W.P. Carey School of Business, Arizona State University, Tempe, Arizona, 85287, USA We correct errors in Li et al. (2021) in this note. capacity planning; erratum; flexible capacity; qualification; sequence-dependent setup 1.Page 3377, left column, equation (4): replace (Formula presented.) with (Formula presented.). 2.Page 3380, left column, equation (26): replace (Formula presented.) with (Formula presented.). 3.Page 3380, right column, replace “Constraints (1)–(13) except (2) and (15)” with “Constraints (1)–(13) except (2) and (10), and constraint (15)”, and add the following constraint after equation (27): (Formula presented.). 4.Online Appendix A3, replace Tables 23–26 with the following: A.3 Output 23 TABLE Cost Summary (Table presented.) 24 TABLE Job Finish Details (Table presented.) 25 TABLE Machine Schedule Summary (Table presented.) 26 TABLE Machine Schedule Detail (Table presented.) A.3 Output 23 TABLE Cost Summary (Table presented.) 24 TABLE Job Finish Details (Table presented.) 25 TABLE Machine Schedule Summary (Table presented.) 26 TABLE Machine Schedule Detail (Table presented.).
AB - Correspondence Hongmin Li, W.P. Carey School of Business, Arizona State University, Tempe, Arizona, 85287, USA We correct errors in Li et al. (2021) in this note. capacity planning; erratum; flexible capacity; qualification; sequence-dependent setup Correspondence Hongmin Li, W.P. Carey School of Business, Arizona State University, Tempe, Arizona, 85287, USA We correct errors in Li et al. (2021) in this note. capacity planning; erratum; flexible capacity; qualification; sequence-dependent setup 1.Page 3377, left column, equation (4): replace (Formula presented.) with (Formula presented.). 2.Page 3380, left column, equation (26): replace (Formula presented.) with (Formula presented.). 3.Page 3380, right column, replace “Constraints (1)–(13) except (2) and (15)” with “Constraints (1)–(13) except (2) and (10), and constraint (15)”, and add the following constraint after equation (27): (Formula presented.). 4.Online Appendix A3, replace Tables 23–26 with the following: A.3 Output 23 TABLE Cost Summary (Table presented.) 24 TABLE Job Finish Details (Table presented.) 25 TABLE Machine Schedule Summary (Table presented.) 26 TABLE Machine Schedule Detail (Table presented.) A.3 Output 23 TABLE Cost Summary (Table presented.) 24 TABLE Job Finish Details (Table presented.) 25 TABLE Machine Schedule Summary (Table presented.) 26 TABLE Machine Schedule Detail (Table presented.).
UR - http://www.scopus.com/inward/record.url?scp=85130014377&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85130014377&partnerID=8YFLogxK
U2 - 10.1111/poms.13682
DO - 10.1111/poms.13682
M3 - Comment/debate
SN - 1059-1478
VL - 31
SP - 1890
EP - 1892
JO - Production and Operations Management
JF - Production and Operations Management
IS - 4
ER -