Abstract
A study of the design/build and non-design/build project delivery experiences of one construction company was conducted to measure the advantages and disadvantages of both delivery methods. How the design/ build project delivery method affected contractor employee satisfaction was investigated. The focus of the study was field-level discernment rather than overall corporate management perceptions. An employee survey targeted the contractor's field-level management and consisted of seven open-ended questions. The respondents were consistently optimistic about design/build practices within the company. This study provides contractors with valuable knowledge of the advantages and disadvantages of design/build and non-design/build project delivery methods.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 180-185 |
| Number of pages | 6 |
| Journal | Practice Periodical on Structural Design and Construction |
| Volume | 3 |
| Issue number | 4 |
| DOIs | |
| State | Published - Nov 1998 |
ASJC Scopus subject areas
- Civil and Structural Engineering
- Building and Construction
- Arts and Humanities (miscellaneous)
Fingerprint
Dive into the research topics of 'Field-level management's perspective of design/build'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS